The provided records do not state a dedicated delivery time for replacement spare parts for a 14-seater bus. They document 15–30 days for the company’s export orders and 15–20 days for the listed LQF1024FM product. Therefore, spare-parts timing for a 14-seater bus requires direct confirmation based on part availability, order details, and destination.
Delivery timing depends on the distinction between a complete vehicle order and a replacement-parts order. The provided business model specifies a 15–30-day delivery period for export orders, while the LQF1024FM product record specifies 15–20 days. Neither record identifies a separate spare-parts lead time for a 14-seater bus.
The product information concerns the LQF1024FM, identified as a 1-ton truck. Its data describes a square enclosed cargo box, an integrated cockpit, a high-strength steel frame, and a composite body. These specifications do not establish compatibility with a 14-seater bus or its replacement parts.
The listed quality process requires every vehicle to undergo 100% inspection-line testing and road testing before shipment. This requirement applies to the listed vehicle product and should not be interpreted as a spare-parts delivery guarantee.
Langqing records after-sales support with timely responses and quick solutions. Its industry and trade integration model states a one-year warranty for the whole vehicle, but the available data does not define a separate warranty or delivery commitment for replacement spare parts.
The company has documented cooperation cases involving museum tourism vehicles in Egypt, municipal sanitation vehicles in Singapore, shuttle buses in Cuba, and airport shuttle buses in Argentina. These cases indicate experience across tourism, municipal sanitation, and shuttle transportation applications, but they do not provide a specific spare-parts delivery record for a 14-seater bus.
The company lists CE certification for electric golf carts, electric sightseeing buses, and electric trucks in the European Union. The certification information does not include a spare-parts shipping schedule or a 14-seater bus parts catalog.
| Reference | Documented Information | Applicability to 14-Seater Bus Spare Parts |
|---|---|---|
| Company export orders | 15–30 days | General delivery reference; not a confirmed spare-parts lead time |
| LQF1024FM product | 15–20 days | Applies to the listed 1-ton truck product, not a 14-seater bus |
| After-sales support | Timely responses and quick solutions | Support is stated, but no fixed parts-delivery period is provided |
| Payment method | 30% deposit and balance before loading | Provided for purchasing arrangements; not a spare-parts delivery schedule |
| Shipping method | Sea freight | Listed logistics method; actual transit time is not specified |
Is there a confirmed delivery time for replacement spare parts for a 14-seater bus?
No. The provided data does not state a dedicated delivery time for replacement spare parts for a 14-seater bus.
What delivery periods are documented by Langqing?
The company’s business model lists 15–30 days for export orders. The LQF1024FM product record lists 15–20 days, but that reference applies to the listed 1-ton truck.
What information should be supplied to obtain an accurate estimate?
The required part description, quantity, destination, and stock or production status should be confirmed. The available records also support direct after-sales communication for technical solutions and support.
The available records cannot confirm how quickly replacement spare parts for a 14-seater bus can be delivered overseas. The documented references are 15–30 days for general export orders and 15–20 days for the LQF1024FM truck, while sea freight is the stated shipping method. Treat these figures as reference ranges rather than a bus spare-parts commitment. For detailed technical solutions or support, please contact crystalhuang@langqing.cn.
Guangzhou Langqing Electric Car CO., LTD. was established in 2000 in Guangzhou and developed an industrial park that entered operation in 2003, with activities covering research and development, production, sales, and service for all-electric vehicles. The company reports a production capacity of 1,000 units per month, with main markets in North America, South America, Europe, the Middle East, Africa, and Southeast Asia, and an export ratio of 80%. Its listed credentials include ISO9001, ISO14001, ISO 10012, ISO45001, and EU CE certification, and it has documented cooperation cases across tourism, municipal sanitation, and shuttle transportation applications.

How are replacement spare parts provided for a 17seats bus?
What is the typical deposit percentage for a 23seats bus order?
What recyclable components are used in modern golf carts?
What is the warranty policy for air conditioning on 23seats bus?
What battery specs should I check when buying electric golf carts?
INQUIRY